5 Yearly Drilling Equipment Overhaul
One of our main specialties is the planning and execution of the 5 yearly certification of the derrick drilling equipment, which is done according to the manufacturer’s specifications and as per API recommendations. We have multidisciplined, rope access rig building teams provided with a thorough knowledge and proven experience in this critical scope, carried out in derricks of different generations and OEM’s.
For each equipment removal / installation, we perform detailed lifting plans, preliminary analysis of risk assessment and project scope management/accomplishment until its completion. Find below a list of the pieces of equipment usually included, but not limited to;
- Top Drive, DDM and Gear Box
- Dolly Removal / Assembly
- Travelling Block
- Removal and Installation of the drill line (De-string / String up)
- DSC and CMC Cylinder replacement
- Crown Block, Cluster Assemblies and Housing replacement
- Fast and Dead Line Rocker Arms and Sheaves
- Active heave cylinder replacement offshore, (without crane assistance)
- DAT cylinder replacement and seal changes
- Pipe Racking System